The model was created as a carrier of information for facility management. The basis was the drawing documentation of the actual construction and data from the construction process. Non-graphical information was specified and communicated in detail with the client. The model contains the technical equipment of the building. All elements are sorted according to the SNIM system.
The model was created as a carrier of information for facility management. The basis was the drawing documentation of the actual construction and data from the construction process. Non-graphical information was specified and communicated in detail with the client. The model contains the technical equipment of the building. All elements are sorted according to the SNIM system.